Calvary Adelaide Hospital

Location : Adelaide, SA

Customer : Downer EDI

Solution: WireByClick, MLEX

Sector: Health

About the Project

The Calvary Adelaide hospital had a construction budget of $345 million which is the largest private hospital to be built in South Australia. The customer proposed utilising a modular wiring solution to expedite works efficiently to stay within tight construction timelines.

 

Provide a modular solution which assisted the customer in fast-tracking electrical installation for both general lighting and power.

 

Modular solutions applied to over 280 patient rooms throughout the hospital; 11,000 general light fittings and 3,500 power outlets.

 

DALI light fittings and general power outlets were installed using MyModular solutions which incorporated essential and nonessential circuits. A full set of circuited drawings provided with each delivery assisted the customer with the install.

Download Case Study

Customer Testimonial

“The bedroom power installation worked very well with the custom designed packaging and labelling solution. The drawings were done to a high standard”

Brent Davis - Site Supervisor - Downer EDI Engineering Electrical